Cement, stone chips, sand, etc are mixed in the ratio of 1:6 or 1:12. This mixture is put in vibrator machine. This is then poured into the desired size mould. After 24 hours of drying, the blocks are put in the water tank for curing. The blocks are used in construction process after drying.